Statement
 Test facilites
 Third Party lns
   

01) The Mill is operating in strict confirm to ISO 9001-2000, certificates issued by CQM & DQS. The entire process is controllable and traceable
02) All the export products are produced in conform to ASTM & ASME standards
03) Steel making: Electro-arc furnace plus AOD refinery with molten steel inspected acc. to ASTM A761
04) Billets go through:

 

a) Macro corrosion test according to ASTM E381
b) Inclusion content of steel test according to ASTM E 45
c) Average grain size test in conform to ASTM E112
d) Determination of volume fraction in conform to ASTM E562

05) Finished products shall go through:
a) Sampling tests on randomly basis by annealing furnace and batch No.
b) Tension test according to ASTM A370 & ASTM E21
c) Technical test including flaring & flattering tests
d) Hardness test: ASTM E10 & ASTM E18
e) Corrosion test: IGC test acc. to ASTM A262, Huey test, pitting & crevice corrosion test acc.
to ASTM G48 under oxidizing chloride environment.
f) Hydro pressure test, Eddy current test acc. to ASTM E426; Ultrasonic test acc. to ASTM E213

06) Inspection facilities: